Wednesday 26 May 2010

good times and bad times

Between the Bank Holidays.
More progress and a little setback.

.
The bathroom's been coming on fast - most tiles on and grouted.  Doves were amazing and replaced the cracked basin no bother.  Phew, thanks doves.  Installing it was a bit tricky - a leaking tap connector - turned out dad had wrecked an o ring trying to tighten a joint enthusiastically.  Then a leaking trap because of the waste pipe being wedged too high in the floor.  The shower trap leaked a bit but he sorted that out with his favourite grinder and a bit of sealant.  The nice corner toilet had no problems until we left it overnight last Sunday.  That was when we found out about how water pressure in the pipes increases at night when everyone's taps are off.  Oh and about the toilet design that has the overflow above the level of the holes in the cistern where you fix it to the wall.  Thanks doves. 

Monday evening after work it was sunny and we were cheery as we drove over.  I took the nice clean towels ready for finishing the tiles off.  Good thing too.  There was water peeing through the kitchen ceiling.  It had been for a while too.  So the laminate (not suitable for bathrooms or wet environments) floor was soaked and the underlay was too.  That was the towels wet then, trying to mop up.  After 3 days there's not been much evidence of drying despite heating turned up.  at least it isn't smelly - yet, though that could be relative because the ceiling still exudes eau de pee.

MG joined freecycle and posted the greenhouse on Tuesday.  Wednesday morning there were 13 emails.  weds evening, stuart came around to squirt WD40 on the fixings.  friday he's coming to take it away haha.

Thursday 6 May 2010

Bank holiday surge

A lot happened in the bank holiday.  The cooker and hob are connected and working after a bit of wiggling and threadin wires and drilling extra room in the cabinets.  We tiled the bathroom floor including the plywood base, we bought taps and a shower.  The grout was too dark, so I scraped it out and put white in instead.  I think I've removed my fingerprints though.The taps were reduced at Screwfix and are nice and chunky, in stromg cardboard overpackaging.  Then when we moaned at the woman that the shower we want isn't in the new catalogue, she found the code from the old one and there was one left in the country - so we collected it on Tuesday.  It had to be a built in thermostatic valve and fixed head because the shower enclosure's too small for one of those hose and rail things.  It's Mira so should be good and the valve plate matches the tap shape - kind of waisted.

The bath legs went missing so MG got onto B&Q who promised to deliver new ones asap.  They turned up later where I'd put them out of the way.  Then when we opened the big cardboard box to get the basin out it was cracked: seriously cracked like it's had a Humpty Great Fall. Never mind, the bath fits in place, with a bit of dad's extra plaster removed and the wastes will be in the right places for the kitchen ceiling joists.


Meanwhile, Colin has the new maps for calling Judy (call of duty - its a game) so he is distracted and we're having a night off.